Wellington Electricity provides two interactive Geographic Information System (GIS) maps to help customers, developers and other stakeholders understand available network capacity and potential constraints across its electricity distribution network.
These maps provide preliminary information to support connection planning. They help identify areas of the network where capacity constraints or congestion may affect proposed new connections, increased electricity demand, or distributed generation connections. Please read the Important Information section below.
Network Capacity Map
The Network Capacity Map provides an indicative overview of available capacity across Wellington Electricity's distribution network, supporting customers and developers in identifying potential locations for new connections or increased electricity demand.
The map presents estimated available network capacity based on 2026 network conditions. Capacity is assessed from upstream to downstream network levels, and the capacity at each level is limited by the spare capacity available in the upstream network that supplies it.
Capacity information as at: 27 November 2026
[Information TBC]
Distributed Generation (DG) Congestion Map
The DG Congestion Map identifies areas of the distribution network that are currently congested, or that Wellington Electricity's assessment expects to become congested within the next 12 months. Congestion in these areas may affect the connection or export of additional distributed generation.
The assessment considers available network information, historical demand and generation data, existing DG connections, network modelling and forecasting assumptions to identify potential constraints affecting additional distributed generation connections or export.
Congestion information as at: 27 November 2026
[Information TBC]
-
The maps are based on available network and customer information, to the best of Wellington Electricity's knowledge at the time of publication and may be subject to data inconsistencies or limitations.
-
The maps may not fully reflect all network assets, customer connections, existing or proposed DG installations, or changes occurring after the maps' publication dates.
-
For the purposes of the maps, summer is defined as November to February and winter as May to August.
-
Forecast DG connections are estimates based on available information and do not represent confirmed installations at specific locations.
-
Actual network capacity and congestion conditions may differ from those presented. Differences may arise from modelling assumptions, changes in electricity demand or generation, network configuration, other operational constraints and site-specific data. Any identified errors in the published information will be corrected as soon as reasonably practicable.
-
The maps are provided for indicative purposes only and do not constitute confirmation of available network capacity, connection feasibility or approval of a proposed connection.
-
Wellington Electricity makes reasonable efforts to ensure the information presented is accurate and up to date but does not guarantee its accuracy, completeness or suitability for any particular purpose. Wellington Electricity accepts no liability for loss or damage arising from reliance on the maps, to the extent permitted by law.
-
The availability of network capacity or absence of identified DG congestion does not guarantee that a proposed connection can be accommodated without additional restrictions or network upgrades, which may involve significant costs.
-
Connection feasibility and applicable connection requirements will be determined only through Wellington Electricity's formal connection application process, not through the maps.
-
Customers and developers are encouraged to contact Wellington Electricity before making significant investment or development decisions based on the maps.

To help improve our service, what feedback can you give us about this page?